2 person 30 mins ITEM#HITV21-Z 1 YR LTD TV STAND 1 Box H20.5"W55.1"D17.
A B Flat Nut H C Steel Washer Wrench 1 un. 6 un. 6 un. Ø8mm Ø8mm Ø8mm 1 2 Upper Glass 3 Bottom Glass 1 un . 5 6 Stainless Tube 6 un. Ø50*200mm 9 Ø50*80mm 10 Steel Footing 4 un . Ø60*12mm Rubber Mat 4 un . Ø58*18mm Ø50*410mm 600*450mm 7 Stainless Tube 8 un. 8 Screw Rod 6 un. Ø8*500mm Stainless Tube 2 un. 1 un. 1400*450mm 1400*450mm 4 Layer Glass 1 un. Plastic Washer 20 un.
1 7 5 4 8 3 5 2 6 8 B 9 10 A С
Step 1 ● ● Put upper glass(1) on clear floor or carpet, aluminum tray side upwards. Attach screw rod (7) on aluminum trays. 7 1 Step 2 ● Insert 4X stainless tube (5) through screw rod(7).
Step 3 ● Insert 4X plastic washer (8) through screw rod(7). 8 Tip1 : please note the front and back when inserting the plastic washer through the screw rod 7 Step 4 ● Put layer glass (3)through screw rod (7),painting side upwards.
Step 5 ● Insert 4X plastic washer (8) through screw rod(7). Tip2 : please note the front and back when inserting the plastic washer through the screw rod 8 7 9 Step 6 ● Insert stainless tube (4)and (5) through screw rod(7).
Step 7 ● Insert 6X plastic washer(8) through screw rod (7) . 8 Tip3 : please note the front and back when inserting the plastic washer through the screw rod 7 Step 8 ● Put bottom glass (2)through screw rod (7),painting side upwards.
Step 9 ● Insert 6X plastic washer (8) through screw rod(7). Tip 4 : please note the front and back when inserting the plastic washer through the screw rod 8 7 Step 10 ● Insert stainless tube (6) through screw rod (7) .
Step 11 ● ● Insert steel footing (9) and rubber mat (10 ) through screw rod(7) . Fix steel washer (B) and nut (A) on screw rod(7) ,tighten by wrench (C). C A 10 9 HARDWARE REQUIRED B 7 4* A 4* B C Tip5 : please note the front and back when inserting the steel footing and rubber mat Step 12 ● Turn over the stand and place it on the floor.