User Manual

- 9 -
16
1) Take some force to install the EDF set on
the bay as shown then use some hot melt
glue on the gap in order to strengthen the
tighten of the EDF on the bay of main
fuselage.
17
1) Using the attached clear pvc sheet and
two screws to tight up the ESC on the bay
of the main fuselage as shown.
18
1) Install those push robs of elevator and
rudder.