LY Manual

10
9
16. Slide the mast into the step block until it bottoms out. The mast should be
angled backwards slightly.
17. Slide 1/2” main sheet tube with line through opening of the boom.
18. Turn On transmitter and receiver. Pulling the trigger all the way, slide 1/2”
tube as tight as possible to the boom. Turn receiver Off.
19. Mark end of main sheet line where it exits 1/2” tube.
19. With the transmitter on, push the trigger all the way forward, giving you excess
slack in the main sheet line. Tie a double knot at the location you marked on the main
sheet line. Test control setup by pulling the trigger all the way back again. The main
sheet line should be taught, allowing little side to side movement of the boom.
20. Install rear wheels with 8mm nut. Do not over tighten bearings, wheels
should spin freely.