User Manual

5
Notes: automatic water charging instrument(need to be custom-designed),you can add an admission pipe in the bottom of the
instrument. Please contact us freely when you have this need.
2Locking by securing rod (XFS-) construction drawing
1 2 3 54 7
8 9
1 1 1 2 1 3
1 5
1 9
1 8
1 7
2 0
1 6
1 4
1 0
2 12 3 2 22 6 2 5 2 4
6
2 72 83 13 3 3 2
3 5
3 6
3 4
3 0 2 9
1- outer casing 2- Outer frame 3-the upper panel 4-the front panel 5-side/back panel 6-tank 7- water stage register 8- pressure
gage 9-admission components 10-electrical controlling components 11---screws 12- steam release valve 13- security valve 14-the left panel
15- cold air escape-pipe 16- four way bale valve 17-bolts 18-nuts 19-spacer 20- wheeled walker 21-outer scupper 22-frame
23-nuts 24-outer admission pipe 25- heating tube 26-sealed tap 27- automatic flooding solenoid valves 28-feed line 29- triple water
valve 30- exhaust steam pipe 31- pipe weep 32- exhaust steam turning handle 33-nuts 34- water level regulator adapter 35-inner tank
nuts 36-inner tank sealed taps
Notes: automatic water charging instrument(need to be custom-designed),you can add an admission pipe in the bottom of the
instrument. Please contact us freely when you have this need.