User's Guide

Table Of Contents
User Guide | Arcadia Central Station
1. Configure channels in the CCM
2. Add roles and configure the keys on the beltpacks
2.10.3 Using IP Transceivers with the Arcadia Central Station
This set up has a total of 6 FS Edge transceivers with 16 Beltpacks connected. The IP
transceivers are connected via a network that is configured for AES67 traffic. These are
configured using the CCM. There are four 2-wire partylines and a Dante network.
Note: The Dante network must be on a different VLAN or network from the IP transceivers.
Note: The AES67 network must be set up correctly for the IP transceivers in order to meet the needs
of Clear-Com IP transceivers for high levels of PTP accuracy.
See the AoIP Network Recommendations guide, available from the Clear-Com FSII Knowledge
Center.
Page 20