Manual
INTEGRATED POWER SYSTEM 
operation manual
Introduction:
Thank you for purchasing Hitec’s Energy Propel integrated Power System. Featuring a high 
performance, high eciency brushless motor integrated with our Energy Rotor electronic speed 
control! This combination creates an easy straighforward installation and clean wiring layout for 
your multi-rotor
Connecting Your Motor:
1. Connect the power wires from the Motor to the power distribution board or battery.
2. Connect the signal cable to the ight controller according to the instruction. 
Note: The red wire from the Motor should connect to the Positive + and black to the Negative (-) 
side of the Power Distribution Board. 
Power
Distribution 
Board
-
+
Red
Black
Battery
-
+
-
+
Signal Wire
(white & black)
Power Wires
Energy Propel
Motor
180X & 22XX
Series


