User's Manual

Table Of Contents
Installation BAT-F
Release
18
07/2020
43
2Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
To protect the exposed uninstalled contacts of the components from dirt,
connect the individual system components in a dry and clean working area.
The device fulfills the protection class IP65/67 under the following conditions,
exclusively:
All the connectors and cables connected also fulfill protection class IP65/
67.
The protection screws seal all unused connections and ports. The
protection screws also fulfill the protection class IP65/67.
If your device is equipped with an impact protection, proceed as follows when
mounting the components:
Remove the impact protection.
Mount the components.
Mount the impact protection.
Perform the following steps to install the device:
Checking the package contents
Installing and grounding the device
Installing an SFP transceiver (optional)
Installing the antennas
Connecting the power supply and the signal contact lines
Operating the device
Connecting data cables
2.1 Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 81.
Check the individual parts for transport damage.
2.2 Installing and grounding the device
2.2.1 Installing the device onto or on a flat surface
You have the option of attaching the device with suitable hardware to a
vertical flat surface.