Instructions / Assembly

inge-It
®
Corp.
H
The BEST Towel Bars and Clothes Racks You’ll Find!
3999 Millersville Rd. • Indianapolis, IN 46205
T: (317) 542-9514 • F: (317) 542-9524 • E: info@hingeit.com
www.hingeit.com
Hinge-It® 1100 SWIVEL ASSEMBLY and INSTALLATION INSTRUCTIONS
IF YOU HAVE A PROBLEM OR SHORTAGE
CALL 1-800-599-6328 M-F 8AM-4PM EST.
WE WILL SEND REPLACEMENT PARTS TO YOU!
CONTENTS:
® Three 1” x 17 1/4” Male steel pole
® One 1” x 17 1/4” Female steel pole (bottom)
® Two 1” large end cap for pole
® Four steel hanger bars
® Four 5/8” small flat end caps for SHORT end of bars.
® Four 1” ball end caps for LONG end bars.
® Eight plastic washer spacers
® Eight 1 1/2” x #10 pan head Screws
® One _” x #10Phillips head screw
® Two slotted hinge brackets
® Nail to aid removing hinge pin.
TOOLS REQUIRED
#2 Phillips Screwdriver, Hammer, Flat bladed screwdriver
1. READ INSTRUCTIONS THOROUGHLY
® Re-read instructions, remove and check all parts. Your
Hinge-It is designed to give a lifetime of service. Screw
holes may be tight. End caps are child proof. Call us if you
have a problem or want to purchase wall mount brackets.
2. INSTALL END CAPS by pushing against a hard surface
like the floor, emerse ball caps in hot water.
® Four 5/8” small flat end caps for SHORT end of bars.
® Four 1” ball end caps for LONG end bars– soak in hot tap
water for a couple of minutes, push on all the way. Note
there is a ridge on the inside for a tight fit. BALL END
CAPS WILL NOT FALL OFF IF INSTALLED
PROPERLY.
® One 1” large end cap for top & bottom of pole.

Summary of content (3 pages)