Installation Guide
18
en
0
0
t
cure
•
Once the gel time “t
gel
” has elapsed, do not disturb the element until “t
cure
”
has passed. Please refer to the Instructions for Use of the mortar for
details about “t
cure
”.
•
For rebar applications, do not disturb the element until “t
cure,ini
” has passed,
if the mortar in use is characterised by “t
cure,ini
”, please refer to the Instruc-
tions for Use of the mortar for details about “t
cure,ini
”.
•
Between “t
cure,ini
” and “t
cure,full
” the mortar has a limited load bearing
capacity. Do not apply the design load on the rebar during this time.
Do not disturb the element
Preparation work may continue for rebar applications
•
Observe the gel time “t
gel
”, which varies according to the temperature
of base material. Please refer to the Instructions for Use of the mortar for
details about t
gel
.
•
Minor adjustments to the anchor/rebar may be performed during the gel
time. For the gel time see relevant information in the manual of the mor-
tars.
Attention!
•
For overhead applications take special care when inserting the anchor/rebar.
•
Excess mortar will be forced out of the borehole. Collect and remove it
safely to protect the installer and the anchor/rebar. Avoid dripping of the
mortar.
•
Position the anchor/rebar and secure it from falling during the curing
time.
0
t
gel
l
inst
0