Installation Guide

18
en
0
0
t
cure
Once the gel time “t
gel
” has elapsed, do not disturb the element until “t
cure
has passed. Please refer to the Instructions for Use of the mortar for
details about “t
cure
”.
For rebar applications, do not disturb the element until “t
cure,ini
” has passed,
if the mortar in use is characterised by “t
cure,ini
”, please refer to the Instruc-
tions for Use of the mortar for details about “t
cure,ini
”.
Between “t
cure,ini
” and “t
cure,full
” the mortar has a limited load bearing
capacity. Do not apply the design load on the rebar during this time.
Do not disturb the element
Preparation work may continue for rebar applications
Observe the gel time “t
gel
, which varies according to the temperature
of base material. Please refer to the Instructions for Use of the mortar for
details about t
gel
.
Minor adjustments to the anchor/rebar may be performed during the gel
time. For the gel time see relevant information in the manual of the mor-
tars.
Attention!
For overhead applications take special care when inserting the anchor/rebar.
Excess mortar will be forced out of the borehole. Collect and remove it
safely to protect the installer and the anchor/rebar. Avoid dripping of the
mortar.
Position the anchor/rebar and secure it from falling during the curing
time.
0
t
gel
l
inst
0
02_BA_HIT_Profi_P1_en.qxd 13.12.2006 13:37 Uhr Seite 18