User Manual
Table Of Contents
- Hillstone Hardware Reference Guide
- Name and Concentration of Toxic or Hazardous Substances and Elements in Products
- Preface
- Table of Contents
- List of Figures
- List of Tables
- Chapter 1 Introduction
- Chapter 2 Installation Preparations
- Chapter 3 Installation
- Chapter 4 Boot and Configuration
- Chapter 5 Troubleshooting
- Copyright Information
- FCC Statement:
Hillstone Hardware Reference Guide
♦ Make sure the workbench is stable and well grounded.
♦ Make sure the intake and the exhaust vents are unblocked, and keep the
device well ventilated.
♦ Do not place any heavy object on the top of the chassis.
Installing the Device on a Rack
Before mounting the device on a rack, ensure that the power is off, and the rack is
stable enough and well grounded. Hillstone devices are designed for a 19-inch
standard rack.
To mount the chassis on a rack:
Step 1:Use rack-mounting ear to mark the positions of floating nuts on the front
rack posts, as shown in Figure 3-2.
Figure 3-2: Installing the Floating Nuts
Step 2: Attach rack-mounting ears to the left and right side panels of the chassis
respectively, and then fasten the rack-mounting ears with suitable screws, as
shown in Figure 3-3.
12
Chapter 3 Installation
| Hillstone