Instructions / Assembly

Assembling Process for ceiling mount
Preparation stage:
Please remove the four M6*10 Screws on the heater, and use them
for Step 1.
Step 1:
Adjust the four sliders which inside the track. The distance between the
sliders should be between 14.96in (0.38m) to 31.02in (0.78m). Attach
the Brackets with four M6*18 screws, tighten them with ‘L
‘hexagonal wrench
10 .
Step 2:
Hook the carabiner at the end of the chains
12 through the holes of
the Brackets .The length adjustment range of two Chains
12 are
between 19.69in (0.5m) to 29.53in (0.75m).
Complete!