Installation Guide
Table Of Contents

2) Connect the other end of Cable 2 to the input interface of Sub Module 1.
Connect one end of Cable 3 to the output interface of Sub Module 1 and
insert it into the middle grid of the le gang box.
3) Finish the wiring and inserng according to the cable number and the
posion shown as below.
Figure 3-60 Install Mounng Frame
The cables connect to each module shown as below.
Figure 3-61 Cables Connecon
Door
Staon Installaon Guide
46