Installation Guide
Table Of Contents

Figure 3-58 Fix the Gang Boxes
8.
Fill and level up the gap between the gang box and wall with concrete. Remove
the mounng ears with tool aer concrete is dry. Pass the grounding line
through the cable entries.
Figure 3-59 Remove the Mounng Ears
Note
The green-yellow line in the package is for grounding.
9.
Connect wires and insert the modules.
1) Connect Cable 1 and one end of Cable 2 to the corresponding interfaces of
the Main Unit, then place the Main Unit into the upper grid of the
le gang
box.
Door
Staon Installaon Guide
45