Installation Guide
Table Of Contents

Figure 3-38 Cave the Installaon Hole
2.
Remove the plasc sheet of the cable entry which will be used.
3.
Insert the gang box into the hole and pull out the cables through the cable entry.
Mark the screw holes’
posion with a marker, and take out the gang box.
Figure 3-39 Mark the Screw Holes
4.
Chisel 4 holes with drill align to marks on the wall, and insert the expansion
sleeves into the screw holes. The suggested size of hole is 6 (diameter) × 45
(depth) mm.
5.
Fix the gang box with 4 expansion bolts.
Door
Staon Installaon Guide
33