User Manual

UM DS-2CEx6H0T-xxITxF 042618NA 11
Figure 15 Install the Junction Box
6. Route the cables through the bottom cable hole or
the side cable hole of the junction box.
7. Combine the junction box cover with its body with
supplied screws on the junction box’s cover.
Figure 16 Attach the Junction Box Cover and Body
8. Repeat the steps 5 to 6 of 2.2.1 Ceiling/Wall
Mounting without Junction Box to complete the
installation.
3.3 Ceiling Mounting of Type III Camera
Steps:
1. Paste the dill template to the ceiling.
2. Drill the screw holes and cable hole (optional) in
the ceiling according to the drill template.
Figure 17 Drill Template