User's Manual

3. Installation Instructions
3.1 Connect DB9 male connector to Programming Unit side.
3.2 Connect DB9 female connector (with power cable) to PC side (COM port).
3.3 Plug in the AC/DC power adapter into the wall power outlet.
3.4 Place the electronic seal / tag up to 10cm from the Programming Unit.
3.5 Use provided Low Frequency communication software to communicate with the
electronic seal / tag.