Installation Manual
© Hexagon AB Commercial in Confidence 55
9 Boot-up Process
After connection of components and power up, the boot up process starts automatically.
1. QC1000 LED turns green, goes into green blink every 10s
Power up process of QC1000 can take up to 90 seconds until all network capabilities are
up and running.
2. In parallel, the QD1400 boots up
a. Splash Screen with progress bar advancing
b. Operator ID login (for testing purposes: type in any number)
c. Traffic Awareness Screen
i. Will show a connection error until QC1000 is booted up completely
ii. When error disappears, system is ready to go