Installation Instructions

©2018 Hestan Commercial Corporation
3
EN
INSTALLATION
(continued)
3. If your unit includes a high shelf, install it and secure with 2 hex bolts from underneath. Carefully
lower the sink into the cutout of your island countertop. Push the sink into position and apply a
small bead of clear silicone sealant around the perimeter of the outer frame to your countertop. Your
qualified technician or plumber may now assemble the water and drain connections in accordance
with local codes. In the absence of local codes, the Uniform Plumbing Code should be followed.
4. Installation of the remaining components are detailed in the image below.
CUTTING BOARD
INSULATED ICE BIN
WITH SLIDING COVER
SPEED RAIL
MODEL GRCHS30 SHOWN
HIGH SHELF
FAUCET
HEX
BOLT