Installation Guide
7
Use caulk gun inject Clear Silicone Sealant
to the wall channel and bottom track.
NOTE:lf the glass is not 3/8", please
ignore this step.Please go ahead to the
next step.
STEP 11
STEP 12
Install the xed panel. Put the xed panel
into the Bottom track and the Wall channel.
If the glass is not 3/8" thick, cut the wedge
vinyl to the exact size of the xed panel
and inse them into the Wall Channel and
Bottom Track.
Measure and cut the Running Rail. Measure
from one wall to the other at the top of the
shower door opening. Mark the running rail
at the determined distance. Cut it from the
end and smooth out the rough edges where
the running rail was cut, taking care to avoid
damaging nished suaces. The cut running
rail should t ush between the walls without
the need for hand pressure.
STEP 13
STEP 14
Install the stoppers. Position the stoppers
on the running rail and secure them
temporarily in place. Do not fasten them;
fasten them after installing the xed panel
and glass panel.
Loosen the glass holders. The glass
holders have been installed on the running
rail. Loosen them by using the installation
rod. This is for installing the xed panel.
Position the outer pa of the wall brackets
on the running rail. Secure them temporarily
in place.
Only cut this side if it is necessa!