Installation & Assembly

3
※Hardware Installation
Step 1: Attach Steel Hangers to Your Doors
a.Please choose the correct roller installation according to your roller shape on page
2 above and the illustration below.
b.Drill 7/16”holes at the distances from the top of the doors shown in the above
chart.Note: The Hanger Bolts are inserted through the back of the door (i.e. the Hanger
and Acorn Nuts attach to the front face of the door).exceptNo.10~No.14
c
.Attach Hangers with the Hanger Bolts, Washers and Acorn Nuts as shown below.
Step 2: Install anti-jump pad
As shown in the illustration, the screw is near the front edge of your door (recom-
mended: drill pilot hole to avoid splitting). Do not over tighten.
Step 3: Connect Tracks And Install Door Stoppers
a.Connect your tracks with junction plates if needed.
b.Loosely install the Door Stoppers near each end of the track (final positioning will
be determined at the end of the installation (Step 8)).
Prepare and Install the Tracks