8'x10 Granbury Instructions
4
PARTS REQUIRED:
3" (7,6 cm)
DOORS
Center doors on panel seam as shown (Fig. B).
5
Check ledger board is still ush under panels.
Remove temporary supports and check doors open properly.
7
FINISH
You have nished installing your doors.
Screw hinge boards into wall supports and oor using (4) 3" screws as shown.
Make sure screws go into framing and oor (Fig. C, D).
6
3" (7,6 cm)
Screws into the wall
support and oor frame.
Fig. B
SEAM
Fig. C
3/8"
(1 cm)
Fig. D
Angle 3" (7,6 cm)
Screw
Attach temporary support OO as a ledger board ush under wall
panels for doors to rest on, using (3) 3" screws
(Fig. A).
x7
OO
72" from
gable panels
OO
Fig. A
72" (182,9 cm)
from bottom of
gable panel to
top of ledger
board
40
TEMPORARY SUPPORT
OO
x1
1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm)