Installation Guide

6
DRIP EDGE ..................... 60 Feet #15 ROOFING FELT
To cover 168 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roong felt.
3-TAB SHINGLES ............................. 7 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 3 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM ........................... 2 Quarts
Use 100% acrylic latex exterior paint.
WOOD GLUE ....................... Exterior Rated
IMPORTANT! Depending on your specic use you may want to construct a heavy duty oor frame by adding additional oor joists
(shown below as shaded). Below is a list of additional materials (not included):
x3
x12
2 x 4 x 10' (5 x 10 x 304,8 cm) Treated Lumber
Cut to (3) 2 x 4 x 117" (5 x 10 x 297,2 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
Optional 12" (30,5 cm) spacing
Standard 16" (40,7 cm) spacing
OPTIONAL MATERIALS
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
COMPLETING YOUR SHED
You will need these additional materials:
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
• This shed does not include any oor or leveling materials. Use our optional oor kit with building instructions and nails included.
• See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your oor,
as this will vary depending on your specic site.
• If you choose to install your kit on a concrete slab refer to page 7.
• If you choose to build your own wood oor foundation refer to page 8.