Installation Guide

Set gable end wall on  oor and secure top of wall
using one 2" screw into top plate (Fig A).
1
38
GABLE SOLID WALL
3" (7,6 cm)
2" (5,1 cm)
x18
2" (5,1 cm)
x2
x1
x14
1-1/2" (3,8 cm)
PARTS REQUIRED:
3" (7,6 cm)
x8
It is important to secure the gable end wall
in the following order:
ENSURE TOP OF WALL FRAMES ARE FLUSH.
3
2
Nail lower edge of panels to  oor using 2" nails 6" apart.
Angle nail to hit  oor frame (Fig. B).
ENSURE GABLE AND EAVE WALL PANELS
ARE FLUSH BEFORE SECURING.
You have  nished standing your gable end wall.
FINISH
7
Secure gable end wall to  oor using 3" nails (Fig. C).
Nail gable end wall panel to eave wall stud
using 1-1/2" nails 6" apart (Fig. C).
4
5
6
6"
(15,2 cm)
Flush
Fig. A
2" (5,1 cm)
Nails
Fig. B
2" (5,1 cm)
Nail
Angle nail to hit
oor frame.
Secure gable wall top frame 2 x 4 using one 3" screw
toe-screwed into eave wall frame at an angle as
shown (Fig. D).
6"
(15,2 cm)
3" (7,6 cm)
Nails
1-1/2"
(3,8 cm)
Nails
Fig. D
3" (7,6 cm)
Screw
BEGIN
Stand wall on  oor.
2" (3,8 cm)
Screw
2"
(5,1 cm)
Screw
Fig. C
Move to the bottom of gable end wall and
secure bottom of wall using one 2" screw into
eave wall bottom plate (Fig A).
Flush
STEP 1 FIRST
SCREW
STEP 3
STEP 2 SECOND
SCREW
2"
(5,1 cm)
Screw
Flush
IMPORTANT!
Determine the gable end wall you want your
double doors on now.
Then, install this solid wall on opposite end.