Installation Guide
HINT:
For easier nailing
stand on frame.
20
EAVE SIDE WALL WITH DOOR LEFT
PARTS REQUIRED:
3" (7,6 cm)
x42
x2
2 x 4 x 80" (5,1 x 10,2 x 203,2 cm)
TK
AO
AO
TOENAILING
x2
2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm)
AO
30"
(76,2 cm)
30"
(76,2 cm)
48"
(121,9 cm)
32"
(81,3 cm)
48"
(121,9 cm)
QT
x2
2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm)
YFA
3" (7,6 cm)
Nails
3" (7,6 cm)
Nails
Two nails at
each location.
YFA
3
Orient parts on edge on oor as shown. Measure and mark.
Use two 3" nails at each mark and four 3" nails at seams.
TK
TK
Flush
Hold Seam
Flush
Flush
x1
2 x 4 x 35" (5,1 x 10,2 x 88,9 cm)
QT