10x12 Hillsdale Instructions
52
PARTS REQUIRED:
GABLE END SOFFITS
Position right 73-5/16" overhang board Primed Side Down ush to front wall (Fig A)
and gable panel seam (Fig B). Secure using twelve 2" nish nails.
Position left 73-5/16" overhang board Primed Side Down
ush to front wall (Fig C),
gable end and right overhang board (Fig. D). Secure using twelve 2" nish nails.
Repeat Steps 1-2 to attach sof t boards on the opposite side.
Ensure soffi t boards are ush at seam (Fig. B) and ush at peak (Fig. D).
x4
3/8 x 7-7/8 x 73-5/16" (1 x 20 x 186,2 cm)
x72
2" (5,1 cm)
2
3
1
BEGIN
You have nished installing your sof t panels.
FINISH
4
Primed Side Down
Flush to wall.
Fig.C
Center and Flush
at peak.
Fig. D
8"
(20,3 cm)
Primed Side Down
Flush to wall.
Fig. A
Fig. B
8"
(20,3 cm)
2" (5,1 cm) Finish Nails
x12 per side
Flush at
center seam.
Flush
Flush