10x12 Hillsdale Instructions

Secure top of wall using one 2" screw into top plate (Fig A).
39
PARTS REQUIRED:
3" (7,6 cm)
x1
2" (5,1 cm)
x25
EAVE SOLID WALL
2" (5,1 cm)
x2
x14
1-1/2" (3,8 cm)
Fig. A
Flush
STEP 3 FIRST
SCREW
BEGIN
Stand eave wall on oor.
Center eave solid wall on the 144" (365,8 cm) oor dimension.
1
Nail gable wall panel to eave wall stud
using 1-1/2" nails 6" apart (Fig. B).
4
5
2
ENSURE GABLE AND EAVE WALL PANELS
ARE FLUSH BEFORE SECURING.
6" (15,2 cm)
Fig. B
1-1/2"
(3,8 cm)
Nails
Fig. C
3" (7,6 cm)
Screw
BE SURE TOP OF WALL FRAMES ARE FLUSH.
2"
(7,6 cm)
Screw
2" (5,1 cm)
Screw
3
Move to the bottom of gable end wall and
secure bottom of wall using one 2" screw
into eave wall bottom plate (Fig A).
Flush
3" (7,6 cm)
Screw
Secure gable wall top frame 2 x 4 using one 3"
screw toe-screwed into eave wall frame
at an angle as shown (Fig. C).
STEP 4 SECOND
SCREW
144"
(365,8 cm)