6676 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-888-827-9056 or email: customer service@backyardproductsllc.com Our staff is ready to provide assistance.
(This page intentionally left blank.
ASSEMBLY MANUAL 16676 05/16/2013 A Backyard Products Company VALUE SERIES LIBERTY 10' x 8' (305 x 244 cm) BUILDING SIZE BASE MODEL ADD ONE 10' x 4' 10' x 8' (305 x 244 cm) 10' x 12' (305 x 365,8 cm) ACTUAL FLOOR SIZE 10' x 7' 8-5/8" (305 x 235,3 cm) 10' x 11' 8-5/8" (305 x 357,2 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
//,3 Required ❑ Phillips Screwdriver Optional ❑ Tool Belt/ Nail Pouch ❑ Utility Knife ❑ Shingle Blades ❑ Drill / Driver ❑ 3/8" Drill Bit ❑ #2 Philips Drive Bit ❑ Tin Snips (for drip edge) ❑ Caulk Gun ❑ Hammer ❑ Chalk Line ❑ Paint Tools ❑ Level ❑ Nail Gun ❑ Pencil ❑ Safety Glasses ❑ Tape Measure ❑ Ladder ❑ Square • gun nails ❑ Gloves or Safety! Always use approved safety glasses during assembly. (%,0&5,2%-).$%239-"/,3 Look for these symbols for helpful reminders throughout this manual.
!$$)4)/.!,-!4%2)!,3 &/5.$!4)/./2&,//2-!4%2)!,3 • This shed kit includes a wood floor system. It does not include any floor panels. • See below for the additional floor panel sizes and quantities required. • This shed does not include any leveling materials. • See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. &,//20!.%,3 .
2%).&/2#%$ X f7//$&,//2&2!-% /04)/.!, IMPORTANT! The included floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below as shaded). Below is a list of additional materials (not included): x5 2 x 4 x 8' (5 x 10 x 244 cm) Treated Lumber Cut to (5) 2 x 4 x 89-1/2" (5 x 10 x 227 cm) x20 ea.
0!243)$%.4)&)#!4)/.!.$3):%3 Part identification is stamped on some parts. WOOD SIZE CONVERSION CHART Treated lumber is stamped: Nominal Board Size Actual Size 2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm) RS RS 2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm) • Check these locations for part stamp.
7!,,0!.%, $//230!243,)34 x1 x4 x1 x2 x1 x1 x1 GABLE 10' x 8' x1 LEFT DOOR RIGHT DOOR 3/8 x 48 x 72" (1 x 122 x 183 cm) 2//&0!.%,3 48" x 96" (122 x 244 cm) x2 19" x 96" (48 x 244 cm) x2 Roof panels are 7/16" (11 mm) thick. GABLE 10' x 12' 3/&&)40!.%,3 x2 3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm) .!),"/8%3 3HOWN!CTUAL3IZE x1 BOXES 3" (7,6 cm) x4 BOXES 2" (5,0 cm) &!34%.
0!243)$%.4)&)#!4)/.!.$3):%3 Part identification is stamped on some parts. Treated lumber is stamped: WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm) RS RS 2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm) • Check these locations for part stamp. X f%84%.
CONCRETE FOUNDA TION If you choose to install your kit on a concrete slab refer to the diagram below . Attach the sill plates on the foundaton as shown, and continue on to page 19. Treated Sill Plate Caulk between sill plate and concrete. D D GABLE 10' x 8' C 3-1/2" (8,9 cm) B A 4" (10 cm) Sill plates MUST be treated lumber.
OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 10' x 8' Kit) Runners are generally 12" (30,5 cm) from ends of floor frame and under seams. Measurements to centers of 4x4's. 12" (30,5 cm) • 3" Screws angled into 4x4. • (2) at each point frame and 4x4 touch. Fig. A Fig.
fX f&,//2&2!-% PARTS REQUIRED: x28 3" (7,6 cm) x2 2 x 4 x 72" (5 x 10 x 183 cm) Treated Wood x6 2 x 4 x 89-1/2" (5 x 10 x 227 cm) Treated Wood x2 2 x 4 x 48" (5 x 10 x 122 cm) Treated Wood BEGIN Orient parts as shown on flat surface. Measure and mark from end of boards. 2 Use two 3" nails at each mark. O R 1 GABLE 10' x 8' 3 D O FINISH You have finished your 10' x 8' floor frame. If building 10' x 12' kit go to page 12. 120" (305 cm) 96" (244 cm) HINT: For easier nailing stand on frame.
LEVELING & SQUARING A 10 x 8' FLOOR FRAME • FOR 10' x 12', SKIP TO PAGE 12 LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN 1 See page 9 for the preferred floor leveling method. Use level and check the frame is level before applying floor panels. 3 Check for frame squareness by measuring diagonally across corners.
X f&,//2&2!-% PARTS REQUIRED: x28 3" (7,6 cm) x2 2 x 4 x 72" (5 x 10 x 183 cm) x2 2 x 4 x 48" (5 x 10 x 122 cm) x6 2 x 4 x 45" (5 x 10 x 114,3 cm) BEGIN You will build two floor sections. Follow steps 1-3 on page 10 to build front 10' x 8' floor section 1. 2 Orient parts as shown on flat surface to build back section 2. Measure and mark each dimension from end of boards. 3 Use two 3" nails at each mark. Section 2 Section 1 HINT: For easier nailing stand on frame.
X f&,//2&2!-% x20 4 3" (7,6 cm) Put both floor sections together and attach as shown using 3" nails. FINISH You have finished your floor frame. Proceed to level and square frame. D O O R 5 Section 2 Section 1 GABLE 10' x 8' (4) Nails per side, stagger pattern. DO OR 120" (305 cm) .
LEVELING & SQUARING A 10 x 12' FLOOR FRAME LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN GABLE 10' x 8' 1 See page 9 for the preferred floor leveling method. 2 Use level and check the frame is level before applying floor panels. 3 Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square.
fX f&,//20!.%,3 .OT)NCLUDED PARTS REQUIRED: x55 48" x 92-5/8" (122 x 235,3 cm) x1 2" (5 cm) FLOOR PANELS NOT INCLUDED. SEE PAGE 3 FOR PANEL SIZES AND QUANTITIES. Ensure your floor frame is square by installing one panel and squaring frame. BEGIN Attach the 48 x 92-5/8" panel with the rough side up (painted-grid lines side) with the 48" edge and corner flush to the floor frame (Fig A). Secure panel with two 2" nails in the corners. D O O R 1 Move to the opposite end.
fX f&,//20!.%,3 .OT)NCLUDED PARTS REQUIRED: x1 x95 FLOOR PANELS NOT INCLUDED. SEE PAGE 3 FOR PANEL SIZES AND QUANTITIES. x1 48" x 92-5/8" (122 x 235,3 cm) 2" (5 cm) 5/8 x 23-7/8 x 92-5/8" (1,6 x 61 x 235 cm) Continue installing panels with rough side up (painted grid lines). 6 Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. .
fX f&,//20!.%,3 .OT)NCLUDED PARTS REQUIRED: 48" x 96" (122 x 243,8 cm) x1 x57 2" (5 cm) FLOOR PANELS NOT INCLUDED. SEE PAGE 3 FOR PANEL SIZES AND QUANTITIES. BEGIN Attach the 48 x 48" panel with the rough side up (painted-grid lines side) on Section 2 with the 48" edge and corner flush to the floor frame and Section 1. 2 Secure using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.
fX f&,//20!.%,3 .OT)NCLUDED PARTS REQUIRED: x1 5/8 x 23-7/8 x 48" (1,6 x 61 x 122 cm) x24 2" (5 cm) FLOOR PANELS NOT INCLUDED. SEE PAGE 3 FOR PANEL SIZES AND QUANTITIES. Continue installing panels with rough side up (painted grid lines) as shown. 4 Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. . D O O R 3 GABLE 10' x 8' FINISH 5 You have finished Installing your floor panels. Continue on page 19.
)-0/24!.4 IMP O R TA N T ! Check the floor frame is level after installing floor panels. Re-level if needed. GABLE 10' x 8' OR DO • The floor should used as a stable work surface for wall construction. HINT: • Organize your assembly procedure during the build process to avoid over-handling of the walls.
2!&4%2!33%-",9*)' x8 PARTS REQUIRED: x2 GAA 3/4 x 3 x 5" (1,9 x 7,6 x 12,7 cm) x2 GBA 3/4 x 3 x 8-1/4" (1,9 x 7,6 x 21 cm) ¸1 1-1/4" (3,2 cm) BEGIN Build a Jig to ensure all Rafters are assembled the same. Mark a straight line on the Floor from corner to corner (Fig. A) or on sill plates to fit measurements (Fig. B). 3 Screw blocks in place to measurement shown. D O O R 2 4 You have finished building a Rafter Jig. (2) 1-1/4" (3,2 cm) Screws per block 125' (317.
RAFTERS 10x8' 10x12' PARTS REQUIRED: x6 x10 x6 x10 x72 x102 6 x 24" (15 x 61 cm) CV 2 x 4 x 65-7/8" (5 x 10 x 167 cm) 2" (5 cm) • FOR 10' x 8', ASSEMBLE (3) RAFTERS TOTAL. ¸1 • FOR 10' x 12', ASSEMBLE (5) RAFTERS TOTAL. BEGIN D 2 Apply glue on gusset and place on rafters. 3 Nail gusset onto rafter using 2" nails, staggered, as shown. 4 Flip over rafter assembly and glue and nail gusset to back side.
"!#+7!,,&2!-% PARTS REQUIRED: x1 x6 3" (7,6 cm) NH 2 x 3 x 46-1/4" (5 x 7,6 x 117,5 cm) PB x2 2 x 3 x 77" (5 x 7,6 x 196 cm) x1 PR 2 x 3 x 94-1/2" (5 x 7,6 x 240 cm) BEGIN Orient parts on edge on floor as shown. 2 Nail using two 3" nails at each connection.
"!#+7!,,&2!-% x2 PARTS REQUIRED: x1 3" (7,6 cm) NH 2 x 3 x 46-1/4" (5 x 7,6 x 117,5 cm) 3 Orient parts on edge on floor as shown. 4 Use two 3" screws at middle connection. FINISH O O R You have finished building your back wall frame.
"!#+7!,,0!.%,3 PARTS REQUIRED: x33 2" (5 cm) x1 3/4" GAUGE BLOCK Use a 3/4" gauge block at edges of panel. Be sure to maintain 1" measurement between bottom edge of frame and bottom edge of panel (Fig. A, B). 3 Nail using 2" nails 6" apart on edges and 12" apart inside panel. R 2 O Place LEFT panel on back frame as shown with primed side facing up. O 1 D GABLE 10' x 8' BEGIN . Do not nail in groove. For squareness maintain 3/4" measurement along panel edges.
"!#+7!,,0!.%,3 PARTS REQUIRED: x33 2" (5 cm) x1 3/4" GAUGE BLOCK Place RIGHT panel on back frame as shown with primed side facing up. 5 Use a 3/4" gauge block at edges of panel. 6 Nail using 2" nails 6" apart on edges and 12" apart inside panel. 7 Proceed to building your wing wall panels. D O O R . Do not nail in groove. GABLE 10' x 8' 4 6" (15,2 cm) To draw panels tight at seams angle nail.
7).'7!,,0!.%,3 x32 PARTS REQUIRED: x2 LEFT x2 RIGHT x4 1-1/4" (3 cm) OY 2 x 3 x 72" (5 x 7,6 x 183 cm) You will assemble TWO RIGHT and TWO LEFT wing walls. 2 Place OY on floor. Place a wing wall panel primed side down onto OY (Fig. A) and flush to panel edges as shown. 3 Secure flush to edges using eight 1-1/4 screws 10" apart. 4 You have finished building two sets of wing wall assemblies. Set ONE LEFT and ONE RIGHT aside. Continue building your back wall.
"!#+7!,,0!.%,3 PARTS REQUIRED: x24 2" (5 cm) Pre-assembled x1 LEFT x1 Pre-assembled RIGHT 6 Nail left and right wing wall assemblies onto back wall frame using 2" nails 6" apart. Do not nail in groove. R Place wing wall assemblies onto frame with bottom of panels flush. O 5 7 O D You have finished attaching your wing walls. GABLE 10' x 12' Primed Side UP LEFT 3-A Flush 6" (15 cm) RIGHT HINT: To draw panels tight at seams angle nail. Flush Use a 2x3" for support.
&2/.47!,,&2!-% PARTS REQUIRED: x6 3" (7,6 cm) LT x1 2 x 3 x 22-1/8" (5 x 7,6 x 56 cm) x2 PB 2 x 3 x 77" (5 x 7,6 x 196 cm) x1 PR 2 x 3 x 94-1/2" (5 x 7,6 x 240 cm) Nail two PB to PR with two 3" nails at each end. 3 Ensure LT is centered with PR and nail in place with two 3" nails. R 2 O Lay out two PB, one PR and one LT on edge on floor. O 1 D GABLE 10' x 8' BEGIN FINISH 4 LT You have finished building your Front Wall Frame.
&2/.47!,,0!.%,3 x22 PARTS REQUIRED: 2" (5 cm) x1 3/4" GAUGE BLOCK BEGIN 2 Use a 3/4" gauge block at edges of panel. Be sure to maintain 1" measurement between bottom edge of frame and bottom edge of panel (Fig. A). 3 Nail panel to frame with 2" nails 6" apart. D O O R Place LEFT panel on front frame as shown with primed side up. Do not nail in groove. GABLE 10' x 8' 1 3/4" GAUGE BLOCK Fig. A GABLE 10' x 12' 1" (2,5 cm) For squareness, maintain 3/4" measurements along panel edges.
&2/.47!,,0!.%,3 x22 PARTS REQUIRED: 2" (5 cm) 3/4" GAUGE BLOCK Place RIGHT panel on front frame primed side up. 5 Use a 3/4" gauge block on edges of panel. 6 Nail panel to frame with 2" nails 6" apart. O R Do not nail in groove. D GABLE 10' x 8' 4 O x1 To draw panels tight at seams angle nail. GABLE 10' x 12' Primed Side UP Panels Flush 3/4" (1,9 cm) Gauge Block 6" (15,2 cm) 97-1/2" (247,7 cm) 3/4" (1,9 cm) 1" (2,5 cm) For squareness, maintain 3/4" and 97-1/2" measurements.
&2/.47!,,0!.%,3 PARTS REQUIRED: x24 2" (5 cm) Pre-assembled x1 LEFT x1 Pre-assembled RIGHT 7 Place wing wall panels onto frame with bottom of panels flush. 8 Nail left and right wing wall assemblies using 2" nails 6" apart. D FINISH 9 You have finished attaching your wing walls. GABLE 10' x 8' O O R Do not nail in groove. Primed Side UP GABLE 10' x 12' 6" (15,2 cm) 6" (15,2 cm) Flush To draw panels tight at seams angle nail. Flush Use a 2x3" for support.
fX f3)$%7!,,&2!-%3 PARTS REQUIRED: x14 3" (7,6 cm) x4 7/16 x 2-1/2 x 24-3/4" (1,1 x 6,4 x 62,9 cm) x6 OV 2 x 3 x 69" (5 x 7,6 x 175 cm) x2 PM 2 x 3 x 92-5/8" (5 x 7,6 x 235,3 cm) • FOR 10' x 12', SKIP TO PAGE 36 GABLE 10' x 8' BEGIN Orient parts on edge on floor. Measure and mark from end of boards. 2 Use two 3" nails at each mark.s. D O O R 1 IMPORTANT! You will build two walls the same.
fX f3)$%7!,,&2!-% 3/&&)4 PARTS REQUIRED: x22 1-1/4" (3,2 cm) x2 3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm) 4 Place panel onto 2 x 3 with primed side against 2 x 3 (Fig A) Keep panel flush along entire edge of 2 x 3 top plate (Fig A). GABLE 10' x 8' Attach soffit panel flush to 2 x 3 (Fig A) and with 3/8" offset at ends (Fig. B, C) using eleven 1-1/4" screws. D O O R 5 Approximate screw spacing 9-1/2" (24 cm) 3/8" (10 mm) Fig. C 93-1/4" (236,9 cm) Fig. B PRIMED SIDE Flush Fig.
fX f3)$%7!,,0!.%,3 PARTS REQUIRED: x58 3/4" GAUGE BLOCK x2 3/8 x 48 x 72" (1 x 122 x 183 cm) 5 2" (5 cm) Ensure your wall frame is square by installing one panel and squaring frame. Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges. GABLE 10' x 8' D O O R Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel flush under the soffit panel. Secure panel with two 2" nails in the corners (Fig. A).
fX f3)$%7!,,0!.%,3 PARTS REQUIRED: 2" (5 cm) 3/8" x 48" x 72" (1 x 122 x 183 cm) x2 8 x58 Place 48" panel on frame as shown with primed side facing up. NOTE THE SQUARE AND LIP EDGES. Do not nail in groove. D O O R Nail using 2" nails 6" apart on edges and 12" apart inside panel. GABLE 10' x 8' Flush To draw panels tight at seams angle nail. 12" (30 cm) GABLE 10' x 12' 6" (15 cm) 48" (122 cm) LIP EDGE SQUARE EDGE D O O R Carefully flip your sidewall over.
fX f3)$%7!,,&2!-%3 PARTS REQUIRED: x28 x4 3" (7,6 cm) x4 7/16 x 2-1/2 x 24-3/4" (1,1 x 6,4 x 62,9 cm) x6 7/16 x 2-1/2 x 24" (1,1 x 6,4 x 61 cm) x2 OV 2 x 3 x 69" (5 x 7,6 x 175 cm) x2 NK 2 x 3 x 48" (5 x 7,6 x 122 cm) PM 2 x 3 x 92-5/8" (5 x 7,6 x 235,3 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark from end of boards. 2 Use two 3" nails at each mark. GABLE 10' x 12' O R O D GABLE 10' x 8' IMPORTANT! You will build two walls the same.
fX f3)$%7!,,&2!-% 3/&&)4 PARTS REQUIRED: x32 1-1/4" (3,2 cm) x2 3/8 x 5 x 48" (0,9 x 12,7 x 122 cm) x2 3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm) 3 Place panels onto 2 x 3 with primed side against 2 x 3 as shown (Fig A) Keep panel flush along entire edge of 2 x 3 top plate (Fig A). O D Fig. C Fig. B 3/8" (10 mm) GABLE 10' x 8' R Attach soffit panels flush to 2 x 3 (Fig A) and with 3/8" offset at ends (Fig. B, C) using fourteen 1-1/4" screws.
fX f3)$%7!,,0!.%,3 PARTS REQUIRED: x58 2" (5 cm) 3/4" GAUGE BLOCK x2 3/8 x 48 x 72" (1 x 122 x 183 cm) Ensure your wall frame is square by installing one panel and squaring frame. 5 Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges. GABLE 10' x 8' D O O R Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel flush under the soffit panel. Secure panel with two 2" nails in the corners (Fig. A).
fX f3)$%7!,,0!.%,3 PARTS REQUIRED: x148 2" (5 cm) 3/8" x 48" x 72" (1 x 122 x 183 cm) x4 8 Place 48" panels on frame as shown with primed side facing up. NOTE THE SQUARE AND LIP EDGES. Do not nail in groove. D O O R Nail using 2" nails 6" apart on edges and 12" apart inside panel. GABLE 10' x 8' Flush To draw panels tight at seams angle nail.
"!#+7!,,).34!,,!4)/. PARTS REQUIRED (TEMPORARY): x1 x8 3" (7,6 cm) OO x24 2 x 3 x 69" (5 x 7,6 x 175,3 cm) 2" (5 cm) BEGIN 1 Center back wall assembly on the 120" (305 cm) floor dimension. 2 Use OO as a temporary brace. Secure with two 3" screws. GABLE 10' x 8' D O O R NOTE: 10' x 8' Gable Shown GABLE 10' x 12' 3 4 ) 305 cm 120" ( 3" (7,6 cm) Screws First, nail lower edge of panel to floor frame using 2" nails 6" apart. Angle nail to hit floor frame (Fig. A). Do not nail in groove.
3)$%7!,,3).34!,,!4)/. X f X f x2 x4 x8 x30 x39 3" (7,6 cm) 3" (7,6 cm) 2" (5 cm) Additional fasteners needed for 10' x 12' kit or kit. Same instructions apply. BEGIN D O O R Stand right sidewall on floor. It is important to secure the sidewall in the following order: Soffit Panel Center sidewall on floor front to back. Panel Nail the top of the sidewall so the soffit panel overlaps the backwall panel 3/8" (Fig. A). 3/8" (0,9 cm) OVERLAP Trim Fig. B Fig.
&2/.47!,,).34!,,!4)/. x8 3" (7,6 cm) x36 2" (5 cm) BEGIN Stand frontwall on floor. It is important to secure the frontwall in the following order. Center frontwall on floor side-to-side. 3/8" (0,9 cm) OVERLAP D O O R 1 Soffit Panel Trim Panel The sidewall soffit will overlap the frontwall 3/8" (Fig. A). Fig. A GABLE 10' x 8' Nail the frontwall flush to the floor using 2" nails 6" apart. Angle nails to hit floor frame (Fig. B).
'!",%42)x24 PARTS REQUIRED: x4 1-1/4" (3 cm) CD 2 x 3 x 54-5/16" (5 x 7,6 x 138 cm) ¸1 BEGIN 3 Repeat steps 1-2 to attach the back trim. O Position second CD flush to panel edge and flush to CD already attached (Fig. A). Attach trim with eight 1-1/4" screws from inside. Install two screws at seam (Fig. B). D 2 O R Position one CD flush to front panel edge and center on right edge of groove (Fig. A). Attach trim with eight 1-1/4" screws from inside. Install two screws at seam (Fig. B).
42)- %.$#!03 x32 PARTS REQUIRED: x4 1-1/4" (3,2 cm) GAA 3/4 x 3-1/2 x 5" (1,9 x 9 x 12,7 cm) x4 GBA 3/4 x 3-1/2 x 8-1/4" (1,9 x 9 x 21 cm) x4 RIGHT PAINTED RED 3/4 x 6-1/4 x 11-7/8" (1,9 x 15,8 x 30 cm) LEFT PAINTED GREEN ¸1 Glue 5" and 8-1/4" boards onto endcaps, and fasten with 1-1/4" screws, as shown. 2 Repeat steps to build two more endcaps. 3 Locate endcaps flush with upper trim and corner trim and attach each endcap from inside of shed using four 1-1/4" screws as shown (Fig. A).
2!&4%23 x12 PARTS REQUIRED: 3" (7,6 cm) x6 pre-assembled 2" (5 cm) x3 ¸1 • FOR 10' x 12', SKIP TO PAGE 46 Attach with two 3" screws at each end (Fig. B). Re-tighten 2" screws if neccessary. 3 Repeat steps to attach three rafters. FINISH 4 You have attached your rafters. Go to page 47. O O GABLE 10' x 8' 2 D Locate rafters directly over studs and flush to overhang in wall frame (Fig. A). Check that you have the measurements shown.
RAFTER INSTALL 10' x 12' x20 PARTS REQUIRED: 3" (7,6 cm) x10 pre-assembled 2" (5 cm) x5 BEGIN Locate rafters directly over studs and flush to overhang in wall frame (Fig. A).Check that you have the measurements shown. Screw through soffit panel into rafters using one 2" screw (Fig. A). 2 Attach with two 3" screws at each end (Fig. B). Re-tighten 2" screws if neccessary. 3 Repeat steps to attach (5) rafters. GABLE 10' x 12' GABLE 10' x 8' D O O R 1 FINISH 4 You have attached your rafters.
TRIM 10' x 8" x20 PARTS REQUIRED: x2 2" (5 cm) HS 1 x 3 x 94-3/4" (2,5 x 7,6 x 240,6 cm) • FOR 10' x 12', SKIP TO PAGE 48. FINISH 3 O Repeat steps to attach fascia trim on both sides. O 2 D Attach fascia trim flush to bottom of soffit (Fig. A) and endcaps at ends of rafters (Fig. B) using 2" (5 cm) nails as shown. GABLE 10' x 8' 1 R BEGIN You have attached your fascia trim. Go to page 51. HS GABLE 10' x 12 Flush Fig. B HS Flush Fig.
TRIM 10' x 12' x33 PARTS REQUIRED: x2 2" (5 cm) HS 1 x 3 x 94-3/4" (2,5 x 7,6 x 240,6 cm) FO x2 1 x 3 x 48" (2,5 x 7,6 x 122 cm) GABLE 10' x 8' BEGIN Attach fascia trim flish to bottom of soffit (Fig. A) and endcaps (Fig. B) using 2" (5 cm) nails as shown. Nail trim to end of rafters and toe-nail trim together (Fig. C) using (1) 2" (5 cm) nail as shown. 2 Repeat steps to attach fascia trim on both sides. D O O R 1 FINISH 3 You have attached your fascia trim. Go to page 51.
2//&0!.%,3 fX f PARTS REQUIRED: x2 x4 2" (5 cm) 7/16 x 48 x 96" (1,1 x 122 x 244 cm) • FOR 10' x 12', SKIP TO PAGE 51. D You must square the roof by attaching one panel fist. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”. BEGIN 1 Flush at peak. Two Nails Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with a 1/8" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B). Fig.
2//&0!.%,3 fX f PARTS REQUIRED: x90 7/16 x 19 x 96" (1,1 x 48 x 244 cm) x2 Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E). R 3 2" (5 cm) GABLE 10' x 8' 24" (61 cm) 24" (61 cm) O D 22-1/4" (56,5 cm) Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel (Fig. F). 2" Nail Fig.
ROOF PANELS 10' x 12' PARTS REQUIRED: x4 2" (5 cm) 7/16 x 48 x 96" (1,1 x 122 x 244 cm) x2 GAA 3/4" GAUGE BLOCK Roof panels may cause serious injury until securely fastened. D O O R BEGIN 1 Flush at peak. Attach the 48 x 96" panel with the rough side up (painted-gr id lines side) with a 3/4" (1,9 cm) measurement on the rafter (Fig A) and the panel Two Nails ush at the peak (Fig. B). Fig. B Secure panel with tw o 2" nails in the corners. GABLE 10' x 12' 48” (122 cm ) 3/4" (1,9 cm) Fig.
ROOF PANELS 10' x 12' PARTS REQUIRED: 7/16 x 19 x 96" (1,1 x 48 x 244 cm) x2 3 Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E). GABLE 10' x 8' Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig. E).
DOORS PARTS REQUIRED: x2 OO x1 1-1/4" (3 cm) 2 x 3 x 69" (5 x 7,6 x 175,3 cm) x4 3" (7,6 cm) HINT: Look for 3/8" SPACER attached to doors. x1 x1 Left Door x1 Right Door GAA 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) BEGIN 2 Attach temporary support OO using 3" screws with 3/4" (1,9 cm) gap from right edges (Fig. A) and at ends. Tighten securely. D O O R Orient parts as shown on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
DOORS x7 PARTS REQUIRED: x1 3" (7,6 cm) OO 2 x 3 x 69" (5 x 7,6 x 175,3 cm) Attach temporary support OO as a ledger board flush under wall panels for doors to rest on, using three 3" screws (Fig. A). D O O R 3 GABLE 10' x 8' OO Fig. A OO 4 GABLE 10' x 12' Flush against wall panels. Center doors on right edge of groove as shown (Fig. B). Check ledger board is still flush under panels. 5 6 Screw hinge boards into wall supports and floor using four 3" screws as shown.
$//2 PARTS REQUIRED: x1 x8 x58 2" (5 cm) ZJ 3/4" (19 mm) x11 5/8 x 3 x 72" (1,6 x 7,6 x 183 cm) 3/4" (19 mm) Bagged separately/ special coating x1 64" Metal Threshold 2 Reinforce the door trim using 3/4" screws through door panel into trim (Fig. A). Locate screws as shown in Fig. B. Use two screws at seams. 3 Center trim ZJ over doors and secure using eight 2" finish nails into framing as shown.
$//27%!4(%2342)0 x14 PARTS REQUIRED: x2 2" (5 cm) OO 2 x 3 x 69" (5 x 7,6 x 175 cm) Secure OO using seven 3" screws through outside trim into OO (Fig. B) 3 On right door center OO vertically in door opening (Fig. A). OO will offset the right door 1" IN from the door trim (Fig. C). 4 Secure OO using seven 3" screws through outside trim into OO (Fig. C). O 2 O With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A).
$//2(!2$7!2% PARTS REQUIRED: x1 x4 x1 3/8" (9 mm) Drill Bit x7 3/4" (1,9 cm) 3/4" (1,9 cm) 3 Install hasp on right door and latch on left door. Bottom edge of hasp is 35-1/2" (90 cm) up from bottom edge of door trim. Measure and mark locations and install with 3/4" screws as shown (Fig B). FINISH 4 You have finished mounting your door hardware. Fig. A O O With door closed mark hole location for bolt to extend into. HINT: Extend bolt to leave a mark in wood. Tap bolt with hammer.
DOOR TRIM x16 PARTS REQUIRED: 3/4" (19 mm) ZZ x8 5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm) BEGIN Position parts on lower pane of Door Panel, as shown. 2 Attach each using two 3/4" (19 mm) screws as shown. 3 D O O R FINISH You have finished attaching your door trim.
0!).4 #!5,+ Ø-.3Ø(-"+4#$#Ø • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.
3().',%3 Ø-.3Ø(-"+4#$#Ø • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch 3().',%.!),0!44%2. 1" (2,5 cm) 1/2" (1,3 cm) Notch Sealing Strip 1" (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. BEGIN 1 Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
3().',%3 BNMSHMTDC 2 2 Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF SHED 1" (2,5 cm) BACK OF SHED Flush with starter row. Notch - or Drip Edge Flush with starter row. Notch 3 Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. FRONT OF SHED BACK OF SHED 1" (2,5 cm) Notch Flush with rain slots.
3().',%3 BNMSHMTDC 5 Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. Cut Off. 5" (12,7 cm) MAX. CUT Top of rain slot. • If more than 5" to rain slot you must install another row of shingles. 6 Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge. 7 Once both sides are shingled you need to trim ends.
SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN 1 Cut shingles intoTHREE pieces. 2" (5 cm) Hint: Use cut-off pieces first. 2" 2" (5 cm) (5 cm) 2" (5 cm) 2" (5 cm) 2" (5 cm) Score shingle, then snap-off angled cut. Weather Seal 10x12' 20 to 22 Pieces 30 to 32 Pieces Top of slot.
3().',%3 2)$'%#!0 BNMSHMTDC 4 Continue installing ridge cap to back of roof. 5 Make sure there is 4" between the shingle-color and edge of shingles. 4" (10,2 cm) 6 Trim cap off flush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot. Cap 7 Install flush to shingles. Flush to shingles (2) Nails per side. FINISH 8 You have finished your ridge cap.
WARRANTY Backyard Storage Solutions, LLC warrants the following: Limited Conditional 1. Every product is warranted from defects in workmanship and manufacturing for one year. Warranty * 2. All hardware and metal components are warranted for two years. 3. Trim is warranted for 10 years. 4. Waferboard siding and sheathing is warranted for two years. 5. SmartSide™ siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings. 6.