Liberty Instructions

59
DOOR
3
PARTS REQUIRED:
x1
x7
3" (7,6 cm)
DOORS
OO
Flush
againstwallpanels.
Fig.A
OO
OO
Center doors on right edge of groove as shown (Fig.B).
4
Checkledgerboardisstillushunderpanels.
Remove temporary supports and check doors open properly.
6
FINISH
7
You have  nished installing your doors.
Screw hinge boards into wall supports and  oor using four 3" screws as shown.
Makesurescrewsgointoframingandoor (Fig.C,D).
5
3"(7,6cm)
Screws into the wall
supportandoorframe.
Fig.B
Center3/8"
measurement on
rightedgeofgroove.
Fig.C
3/8"
(1 cm)
Fig.D
Angle3"(7,6cm)
Screw
Attach temporary support OO as a ledger board  ush under wall
panels for doors to rest on, using three 3" screws (Fig.A).
1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm)