Installation Guide
54
3
PARTS REQUIRED:
x1
x7
3" (7,6 cm)
DOORS
OO
Flush
against wall panels.
Fig. A
OO
OO
2 x 3 x 69" (5 x 7,6 x 175,3 cm)
Center doors on right edge of groove as shown (Fig. B).
4
Check ledger board is still flush under panels.
Remove temporary supports and check doors open
properly.
6
Screw hinge boards into wall supports and floor using four 3" screws as shown.
Make sure screws go into framing and floor (Fig. C, D).
5
Attach temporary support OO as a ledger board flush under wall
panels for doors to rest on, using three 3" screws (Fig. A).
3" (7,6 cm)
Screws into the wall
support and floor frame.
Fig. B
Center 3/8"
measurement on
right edge of groove.
Fig. C
3/8"
(1 cm)
Fig. D
Angle 3" (7,6 cm)
Screw
FINISH
7
You have finished installing your doors.