Installation Guide
40
GABLE 10' x 8' GABLE 10' x 12'
2"
(5 cm)
Nail
6"
(15 cm)
NOTE: 10' x 8' Gable Shown
NOTE: 10' x 8' Gable Shown
Do not nail
in groove.
Use OO as a temporary brace. Secure with two 3" screws.
Center back wall assembly on the 120" (305 cm) fl oor dimension.
2
BEGIN
1
First, nail lower edge of panel to fl oor frame using 2" nails 6" apart.
Angle nail to hit fl oor frame (Fig. A).
3
Screw back wall uprights to fl oor using two 3" screws (Fig. B).
4
5
You have fi nished standing your back wall.
FINISH
120" (305 cm)
3" (7,6 cm)
Screws
Nail 2" nails fi rst.
Angle to nail into
fl oor frame.
2" (5 cm) Nail
Fig. A
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
Fig. B
OO
2" (5 cm)
PARTS REQUIRED (TEMPORARY):
2 x 3 x 69" (5 x 7,6 x 175,3 cm)
x1
x8
x24
"!#+7!,,).34!,,!4)/.
3" (7,6 cm)
OO
DOOR