Installation Guide
14
Runners are generally
12" (30,5 cm) from
ends of floor frame
and under seams.
• 3" Screw angled into 4x4.
• (2) at each point frame and
4x4 touch.
Fig. B
Fig. A
(30,5 cm)
12"
(30,5 cm)
12"
DOOR
Second,
secure at
ends with
one fastener.
First, secure
at ends with
one fastener.
184-7/8"
(469,5 cm)
184-7/8"
(469,5 cm)
LEVELING & SQUARING A 10 x 12' FLOOR FRAME
BEGIN
2
3
4
1
Use level and check the frame is level before applying floor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the
same, the frame is square. The diagonal measurement will be approximately 184-7/8" (469,5 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one
fastener at ends of each runner. At the opposite end of the frame, secure the frame to 4x4
runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).
Once the floor frame is level and square fasten the frame at each point the frame contacts the 4x4
runners (Fig. B). Go to page 17.
See page 9 for the preferred floor leveling method.
FINISH
5
LEVEL AND SQUARE FLOOR FRAME
Before attaching floor decking, it is important to level and square the floor frame.
A level and square floor frame is required to correctly construct your shed.
GABLE 10' x 8' GABLE 10' x 12'