Installation Guide
DOOR
DOOR
DOOR
15
Put both oor sections together and attach as shown using 3" nails.
4
You have nished your oor frame. Proceed to level and square frame.
10 x 16' FLOOR FRAME (Not Included)
(4) Nails per side,
stagger pattern.
FINISH
5
FINISH
5
LEVEL AND SQUARE FLOOR FRAME
Before attaching oor decking, it is important to level and square the oor frame.
A level and square oor frame is required to correctly construct your shed.
BEGIN
2
3
4
1
Use level and check the frame is level before applying oor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the
same, the frame is square. The diagonal measurement will be approximately 224" (568 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at
ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener
at ends of each runner making sure the frame remains square (Fig. A).
Once the oor frame is level and square fasten the frame at each point the frame contacts the 4x4
runners. Continue on page 16.
See page 8 for the preferred oor leveling method.
Fig. A
3" (7,6 cm)
x20
188-5/8"
(479 cm)
120"
(305 cm)
Section 2
Section 1
12"
(30,5 cm)
12"
(30,5 cm)
40-5/16"
(102,4 cm)
Centered
42"
(106,7 cm)
Centered
40-5/16"
(102,4 cm)
Centered
42"
(106,7 cm)
Centered
224"
(568 cm)
224"
(568 cm)
Runners are generally
12" (30,5 cm) from
ends of oor frame
and under seams.
4x4 Runners
(not included).
Measurements to
centers of 4x4's.
Seam