Installation Guide
Notch
- or -
DripEdge
Notch
RoofDeck
1"
(2,5 cm)
Flush with starter row.
Flush with starter row.
47
Beginning at front of shed, install rst row of shingles with notch at 1" past roof edge or ush with drip edge.
2
2
FRONT OF
SHED
BACKOF
SHED
Continue installing rows of
shingles by staggering at front.
4
SHINGLES
continued...
Install second row of shingles ush at top of rst row's rain slots. Ensure 1" overhang or ush to drip edge at front,
stagger each row.
3
1"
(2,5 cm)
1"
(2,5 cm)
BACKOF
SHED
FRONT OF
SHED
FRONT OF
SHED
Flush with rain slots.
Flush with rain slots.
Notch
Notch