Installation Guide
OO
72" from
gable panels
OO
Fig. A
72" (182,9 cm)
from bottom of
gable panel to
top of ledger
board
39
4
PARTSREQUIRED:
3" (7,6 cm)
DOORS
Center doors on panel seam as shown (Fig.B).
5
Checkledgerboardisstillushunderpanels.
Remove temporary supports and check doors open properly.
7
FINISH
8
You have nished installing your doors.
Screw hinge boards into wall supports and oor using four 3" screws as shown.
Makesurescrewsgointoframingandoor (Fig.C,D).
6
3" (7,6 cm)
Screws into the wall
supportandoorframe.
Fig.B
SEAM
Fig. C
3/8"
(1 cm)
Fig.D
Angle 3" (7,6 cm)
Screw
Attach temporary support OO as a ledger board ush under wall
panels for doors to rest on, using three 3" screws (Fig. A).
x7
OO
x1
1-1/2 x 2-1/2 x 69" (3,8 x 7,6 x 175,3 cm)
TEMPORARYSUPPORT