Installation Guide
4
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
ADDITIONAL MATERIALS
DRIP EDGE ..................... 40 Feet
#15 ROOFING FELT
To cover 75 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofi ng felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS
FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................ 4 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 2 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 2 Lbs
For shingles.
PAINT FOR TRIM .............................1 Quart
Use 100% acrylic latex exterior paint.
WOOD GLUE ....................... Exterior Rated
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! The included fl oor has been designed for general use. Depending on your specifi c use you may want to construct a
heavy duty fl oor frame by adding additional fl oor joists (shown below as shaded). Below is a list of additional materials (not included):
x4
x16
2 x 4 x 8' (5,1 x 10,2 x 243,8 cm) Treated Lumber
Cut to 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
Optional
12" (30,5 cm)
spacing
Standard
24" (61 cm)
spacing
FOUNDATION OR FLOOR MATERIALS
• This shed kit includes a wood fl oor system.
• This shed does not include any leveling materials.
• See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your
fl oor, as this will vary depending on your specifi c site.