Installation Guide

4
PARTS REQUIRED:
x1
3" (7,6 cm)
DOORS
OO
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
Center doors on panel seam as shown (Fig. B).
5
Check ledger board is still ush under panels.
Remove temporary supports and check doors open properly.
7
FINISH
8
You have nished installing your doors.
Screw hinge boards into wall supports and oor using four 3" screws as shown.
Make sure screws go into framing and oor (Fig. C, D).
6
3" (7,6 cm)
Screws into the wall
support and oor frame.
Fig. B
SEAM
Fig. C
3/8"
(1 cm)
Fig. D
Angle 3" (7,6 cm)
Screw
Attach temporary support OO as a ledger board ush under wall
panels for doors to rest on, using three 3" screws
(Fig. A).
x7
OO
72" from
gable panels
OO
Fig. A
72" (182,9 cm)
from bottom of
gable panel to
top of ledger
board
39