Installation Guide

33
3" (7,6 cm)
Nail gable panels to front wall panels and LW using 2" nails, 6" apart.
Screw DQ to top plate using two 3" screws (Fig. A).
Place gable assembly centered on front wall top plate overlapping
front wall panels.
2
3
You have nished installing your front wall gable panels.
FINISH
4
BEGIN
1
FRONT WALL GABLE PANELS
PARTS REQUIRED:
2" (5,1 cm)
Nails
2" (5,1 cm)
Nails
2" (5,1 cm)
Nails
Flush
Center gable panel assembly on mark.
LEVEL
LEVEL
2" (5,1 cm)
x18
(2) 3" (7,6 cm)
Screws
(2) 3" (7,6 cm)
Screws
Fig. A
x2
LW
6"
(15,2 cm)
PRE-ASSEMBLED
DQ