Installation Guide

Center FZ on PT on at, ush to front wall panel (Fig. A).
BEGIN
2
3
1
Secure using ve 3" screws on angle spaced evenly.
Mark center of door opening for later alignment.
FRONT WALL TOP PLATE
PARTS REQUIRED:
FZ
FZ
PT
2 x 3 x 66-1/2" (5,1 x 7,6 x 168,9 cm)
x1
FZ
Flush
Fig. A
NOTE:
Drive screws at an angle to
avoid screw points protruding
into the door opening
22
Flush
Front wall panel
CENTER CENTER
Use to maintain
3/8" overhang.
5-1/4"
5-1/4"
x1
GUSSET
TEMPORARY SPACER
3" (7,6 cm)
x5