Installation Guide

4
PARTS REQUIRED:
3" (7,6 cm)
DOORS
Center doors on panel seam as shown (Fig. B).
5
Check ledger board is still ush under panels.
Remove temporary supports and check doors open properly.
7
FINISH
8
You have nished installing your doors.
Screw hinge boards into wall supports and oor using four 3" screws as shown.
Make sure screws go into framing and oor (Fig. C, D).
6
3" (7,6 cm)
Screws into the wall
support and oor frame.
Fig. B
SEAM
Fig. C
3/8"
(1 cm)
Fig. D
Angle 3" (7,6 cm)
Screw
Attach temporary support OO as a ledger board ush under wall
panels for doors to rest on, using three 3" screws
(Fig. A).
x7
OO
72" from
gable panel s
OO
Fig. A
72" (182,9 cm )
from bottom of
gable panel to
top of ledger
boar d
39
TEMPORARY SUPPORT
OO
x1
1-1/4 x 2-1/2 x 69" (3,2 x 7,6 x 175,3 cm)