Installation Guide

29
Nail assembly to back wall panels using 2" nails 6" apart.
Screw LW to top plate using two 3" screws (Fig. B).
Place gable assembly centered on back wall top plate overlapping the
back wall panels 3/4" (Fig. A).
2
3
You have nished installing your back wall gable panels.
FINISH
4
BEGIN
1
BACK WALL GABLE PANELS
PARTS REQUIRED:
BACK WALL
6"
(15,2 cm)
3/4"
(1,9 cm)
2" (5,1) Nails
Nail rst
Flush
LEVEL
LEVEL
2" (5,1 cm)
x18
(2) 3" (7,6 cm)
Screws
(2) 3" (7,6 cm)
Screws
Fig. B
Fig. A
PRE-ASSEMBLED
x2
3" (7,6 cm)
3/4"
(1,9 cm)
3/4"
(1,9 cm)