Installation Guide

68
• Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place.
OK to overlap at ridge.
3" OVERLAP
Flush
Flush
PARTS REQUIRED:
• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all
around the door trim.
• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily
overlooked that must be painted:
• Bottom edge of all siding and trim
• Inside of doors and all 4 edges
Note:
Prime all un-primed exterior wood before painting.
(Follow directions provided by manufacturer.)
PAINT & CAULK
Ø-.3Ø(-"+4#$#Ø
ROOF FELT
Ø-.3Ø(-"+4#$#Ø
DRIP EDGE
Ø-.3Ø(-"+4#$#Ø
Snip bottom side of drip edge and
bend over to other side of roof.
(Follow directions provided by manufacturer.)
• Install drip edge over roof felt on gable side and
under roof felt on eave side (Fig. A).
• Do not use nails on side of drip edge that hangs over side of building.
• Only nail top of drip edge as shown.
Edge flush
to trim.
Fig. A
Drip edge
Drip edge
Roof felt