Installation Guide

59
PARTS REQUIRED:
x13
3" (7,6 cm)
OO
2 x 3 x 69" (5 x 7,6 x 175,3 cm)
OO
72" from overhang
OO
Fig. A
Center doors on mark as shown (Fig. B).
4
Check hinge board is fl ush under overhang (Fig. C).
Remove temporary supports and check doors open properly.
6
FINISH
7
You have fi nished installing your doors.
Screw hinge boards into wall supports and fl oor using ten 3" screws as shown.
Make sure screws go into framing and fl oor (Fig. D, E).
5
3" (7,6 cm)
Screws into the wall
support and fl oor frame.
Fig. B
Center 3/8" measurement
on mark.
Fig. D
Fig. C
3/8"
(1 cm)
Fig. E
Angle 3" (7,6 cm)
Screw
Flush
Attach temporary support OO as a ledger board for doors to rest on, using
three 3" screws. Measure 72" down from underside of overhang (Fig. A).
Locate center of door
opening and mark.
72" (182,9 cm)
from bottom of
overhang to top
of ledger board
x1
3
DOORS