Installation Guide
3
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
DRIP EDGE ..................... 30 Feet #15 ROOFING FELT
To cover 114 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For rooÀng felt.
x6
x20
2 x 4 x 8' (5 x 10 x 244 cm) Treated Lumber
Cut to (5) 2 x 4 x 93" (5 x 10 x 236,2 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
Optional 12" (30 cm) spacing
Standard 24" (60 cm) spacing
• This shed kit includes a complete wood fl oor frame system. It does not include floor panels.
• It does not include ANY leveling materials.
•
See the FLOOR LEVELING section on page 8 for recommended methods and suggested materials to properly level your
Á oor, as this will vary depending on your speciÀ c site.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!
The included fl
fi c use you may want to construct a
fl oor frame by adding additional fl
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
3-TAB SHINGLES ............................ 5 Bundle s
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats r ecommended.
CAULK ................................................. 3 Tube s
Use acrylic latex exterior caulk that is paintable.
s
1" GALVANIZED ROOFING NAILS.... 2 Lb
For shingles.
PAINT FOR TRIM .............................1 Quart
Use 100% acrylic latex exterior paint.
WOOD GLUE ....................... Exterior Rated
FLOOR PANELS (NOT INCLUDED)
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS
FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
x2 x1
3/4 x 48 x 96"
(1,9 x 122 x 244 cm)
3/4 x 45 x 96"
(1,9 x 114 x 244 cm)
Floor Panels are
3/4" (1,9 cm) thick
40 Feet