Installation Guide
32
6"
(15 cm)
64"
(163 cm)
Flush
PT
Flush
3"
(7,6 cm)
Screws
Use one (1) PT across door opening
to maintain 64" dimension
PARTS REQUIRED:
x2
x1
x49
x2
2" (5 cm)
3" (7,6 cm)
FRONT WALL
FINISH
7
You have fi nished attaching your front wall panels.
Proceed to erect your walls.
Use PT as a brace to maintain 64" (163 cm) opening. Use
two 3" screws to attach.
Continue installing panels primed side up fl ush under
overhang (Fig. A). Note 1/4" (6,4 mm) offset on right panel.
Use 2" nails 6" apart on edges, and 12" apart inside panel.
4
7
6
5
2 x 3 x 96" (5 x 7,6 x 244 cm)
PT
3/8 x 15-7/8 x 72" (1 x 40 x 183 cm)
There will be
an overhang
at top
and bottom
Flush panels
under
overhang
Fig. A
LIP EDGE
1/4"
(6 mm)
10 to12"
SQUARE
EDGE
1/4"
(6 mm)
Do not nail
in groove.
Primed
side up