Installation Guide

22
1"
(2,5 cm)
33-1/2"
(85 cm)
1-1/4"
(3,2 cm)
2-1/2"
(6,4 cm)
33-1/2"
(85 cm)
2-1/2" (6,4 cm)
Flush
Flush
12"
(30 cm)
6"
(15 cm)
KZ
PT
PT
temporary support
RK
temporary support
x12
1-1/2" (3,8 cm)
PARTS REQUIRED:
3
2
4
Nail KZ first, 1" (2,5 cm) from panel bottom.
Use 1-1/2" (3,8 cm) nails 6" (15 cm) apart.
Place PT flush to KZ and edge of panel. Hold the 33-1/2" (85 cm)
measurement and nail with 1-1/2" (3,8 cm) 12" (30 cm) apart.
Orient KZ and PT on the flat on floor as shown.
Place panel on KZ and PT with primed side up.
Primed
side up
x1
x1
x2
RIGHT WALL
REAR ASSEMBLY
2 x 3 x 32-1/2" (5 x 10 x 83 cm)
2 x 3 x 96" (5 x 7,6 x 244 cm)
KZ
PT
2 x 3 x 13" (5 x 7,6 x 33 cm)
x1
RK
BEGIN
¸
1
Use only 1-1/2"
(3,8 cm) long nails
RIGHT WALL
Do not nail
in groove.