Installation Guide

32
6"
(15 cm)
64"
(163 cm)
Flush
PT
Flush
3"
(7,6 cm)
Screws
Use one (1) PT across door opening
to maintain 64" dimens
FRONT WALL
PARTS REQUIRED:
x2
x1
x49
x2
2" (5 cm)
3" (7,6 cm)
FINISH
7
You have  nished attaching your front wall panels.
Proceed to erect your walls.
Use PT as a brace to maintain 64" (163 cm) opening. Use
two 3" screws to attach.
Continue installing panels primed side up  ush under
overhang (Fig. A). Note 1/4" (6,4 mm) offset on right panel.
Use 2" nails 6" apart on edges, and 12" apart inside panel.
4
7
6
5
2 x 3 x 96" (5 x 7,6 x 244 cm)
PT
3/8 x 15-7/8 x 72" (1 x 40 x 183 cm)
There will be
an overhang
at top
and bottom
Flush panels
under
overhang
Fig. A
LIP EDGE
1/4"
(6 mm)
10 to12"
SQUARE
EDGE
1/4"
(6 mm)
Do not nail
in groove.
Primed
side up
PT