Installation Guide
22
1"
(2,5 cm)
33-1/2"
(85 cm)
1-1/4"
(3,2 cm)
2-1/2"
(6,4 cm)
33-1/2"
(85 cm)
2-1/2" (6,4 cm)
Flush
Flush
12"
(30 cm)
6"
(15 cm)
RIGHT WALL
PT
RK
temporary support
x12
1-1/2" (3,8 cm)
PARTS REQUIRED:
3
2
4
Nail KZ rst, 1" (2,5 cm) from panel bottom.
Use 1-1/2" (3,8 cm) nails 6" (15 cm) apart.
Place PT ush to KZ and edge of panel. Hold the 33-1/2" (85 cm)
measurement and nail with 1-1/2" (3,8 cm) 12" (30 cm) apart.
Orient KZ and PT on the at on oor as shown.
Place panel on KZ and PT with primed side up.
Primed
side up
x1
x1
x2
RIGHT WALL
REAR ASSEMBLY
KZ
2 x 3 x 32-1/2" (5 x 10 x 83 cm)
2 x 3 x 96" (5 x 7,6 x 244 cm)
KZ
PT
PT
temporary support
2 x 3 x 13" (5 x 7,6 x 33 cm)
x1
RK
Use only 1-1/2"
(3,8 cm) long nails
Do not nail
in groove.