Installation Manual
Page 23 OfficeSense sensor installation v1.1
Installation procedure reference
Preparation checklist
Before sensor deployment can begin, check if these items are taken care of first.
Make sure the local LoRa network is in place (LoRa gateways are deployed and
are connected).
Check if QR codes for the rooms have been printed and placed at the rooms, or if
other identifiers are available as location reference.
Walkthrough this installation manual and procedure with the engineer(s) who are
responsible for installation of the sensors.
Verify the contents of the sensor shipment (also if they are for the right country!).
(Reference this manual for explanation).
If not included in the sensor shipment, make sure sufficient batteries are at hand
(normally AA batteries).
Install the ‘Barcode to Sheet’ app on your smartphone. Reference this manual for
explanation.
Gather other tools you need for sensor deployment (cleaning material, stepladder,
drill, screws and screwdriver, etc).
Deployment steps
All the steps required for mounting and registering the sensors are described below.
Referring to chapters in this manual when extra explanation is needed.
1) Open the ‘Barcode to sheet’ app and open the .csv template (Chapter
Installing
‘Barcode to Sheet’ Application
).
2) Locate the next room
3) Scan the QR code of the room (Chapter
Registering a sensor with the ‘Barcode to
Sheet’
app
).
4) Mount the sensor on the ceiling (Chapter
Mounting the sensor on the ceiling
).
5) Scan the QR code of the sensor (Chapter
Registering a sensor with the ‘Barcode to
Sheet’
app
).
6) Repeat from step 2 until every room has been deployed with sensors
7) Validate and send your .csv file through email (Chapter
Registering a sensor with
the ‘Barcode to Sheet’
app
).