Manual

100K-2GSR Spin Manifold Assembly
Drawings 105
ITEM QTY. PART NO./DESC PORT/DESC. HOSE DESTINATION
1 1 H38 Spin Manifold
2 1 H35 Sequence Valve V2
3 1 H34 Check Valve V4
4 1 H31 Flow Control Valve V7
5 2 H33 Check Valve V3,V8
6 1 H36 Pressure Reducing Valve V1
7 1 H45 Needle Check Valve V9
8 2 2062-8-8S_8MORB x 8MJIC Fitting 90
9 1 206209-6-6S_8MORB x 8MJIC Fitting 90 Ext.
10 1 2216-4-6S_-6MORB x-4FNPT Str. Adaptor
11 1 2081-4-2S 1.4 x 1.8 H.P. Hex Bushing
12 1 2254-2-2S_2MNPT x 2FNPT_T Fitting Swivel
13 1 2216-2-4S_-4MORB x-4FNPT Str. Adaptor
14 1 2047-2-2S 2MNPTX2FNPT Fitting 90 Drg Swivel
15 4 202702-8-8S_-8MORB x -8MJIC Str. Adaptor
16 1 HOS-10_-8FJICx-8FJICx33.00lg. Hose PCR-Spin Manifold Rod-Push Cyl.
17 1 HOS-8_-8FJICx-8FJICx49.00lg. Hose SR-Spin Manifold Rod-Spinmaster
18 1 HOS-7_-8FJICx-8FJICx49.00lg. Hose SP-Spin Manifold Piston-Spinmaster
19 1 HOS-9_-8FJICx-8FJICx24.00lg. Hose PCP-Spin Manifold Piston-Push Cyl.
20 1 HOS-32_1.8MNPTx1.8MNPTx17lg_1.8 Hose RT-Spin Manifold Winch Motor Drain
21 1 JHOS-OIL 1.8MNPTx1.8MNPTx83lg_1.8 Hose RT1 Torque Cylinder
22 1 HOS-18_1.8MNPTx1.8MNPTx54lg_1.8 Hose RT1 Torque Cntrl. Blk, RT
NOTE
To adjust the Spinner move forward, close and open sequence:
1. Use a 5/32" allen wrench to rotate the Push cylinder pressure reducing valve at Port V1 counterclockwise until
refusal.
2. Use a 5/32" allen wrench to rotate the Spinner Door sequence valve at Port V2 clockwise until refusal.
3. Starting with the needle valve at Port V9 full open (turned counterclockwise until refusal), use a 1/4" allen wrench to
rotate the Spinner retract needle valve at Port V9 clockwise until the spinner doors open fully. Then rotate the valve
in the same direction another 1/2 turn, then lock the valve.
4. Use a 5/32" allen wrench to rotate the Spinner motor sequence valve at Port MSEQ on the main hydraulic block
clockwise until refusal.
5. Set the Selector switch to Break. Adjust the spinner to the drill pipe tube OD. Place the HawkJaw on the drill pipe
connection.
6. Press the Grip Hold button. Press the Spin button. Rotate the Push cylinder pressure reducing valve at Port V1
clockwise until the spinner moves forward and the chain touches the pipe. If the chain forces the HawkJaw away
from the pipe, back off on the adjustment until the spinner chain touches the pipe without forcing the Hawkjaw back.
The spinner will close if you hold the spin button too long.
7. Rotate the Spinner Door sequence valve at Port V2 counterclockwise until the spinner doors begin to close as the
spinner chain touches the pipe. For each adjustment, press and hold the Spin button to test the adjustment.
Continue to rotate the adjustment counterclockwise until the spinner begins to close before the chain touches the
pipe. Rotate the adjustment clockwise until the spinner begins to close as the spinner chain touches the pipe.
Lock in the adjustment.
8. For each adjustment, press and hold the Spin button until the spinner doors close. Release the Spin button to test
the adjustment. If the rollers grab the pipe while retracting, adjust the needle valve clockwise. If the chain forces
the HawkJaw backwards while retracting, adjust the needle valve counterclockwise.
9. Adjust the spinner motor sequence valve at Port MSEQ. Use a 3/16" allen wrench to rotate the sequence valve
counterclockwise until the chain moves before the doors close. Next, rotate the adjustment clockwise until the
spinner doors close before the chain moves. Rotate one half-turn clockwise. Lock in the adjustment.