Roof Mounted Load Light Installation Instructions
H:\KwKit\KK-RLL-INST-4-05.doc 
INSTALLATION INSTRUCTIONS KK-RLL 
ROOF MOUNTED LOAD LIGHT  
TOOLS REQUIRED: 
Power drill 
Caulk gun with silicone 
3/8” drill bit 
Safety goggles 
Wrench set 
HARDWARE SUPPLIED: 
1  Work Light with Double Lamp  HE-90600B 
2  5/16 -18 x 1” Stainless Hex Head Bolt  GSM34010 
2  5/16-18 Nylock Nut  GSM30017 
2  5/16” x 1 ½” Fender Washer  GSM31019 
1  3/8” Plastic Grommet  GSM20003 
1  Light mounting Bracket  PRM97310 
INSTALLATION INSTRUCTIONS: 
Note: Mounting and wiring must be done prior to prisoner compartment installation. 
1.  Bolt light fixture to the mounting bracket.  (End with 2” flange and one hole).  
Overall bracket size is 10 ½” long by 2” wide. 
2.  Position load light bracket in desired location on roof: Recommended location is 
to center light above door opening on side or rear of van. If there is a third brake 
light, position the work light over the third brake light not on top of light. 
3.  Mark and drill three (3) 3/8” diameter holes. Bolt the bracket assembly on with 
two (2) stainless steel 5/16-18 x 1” bolts, nuts and fender washers. 
4.  The 3
rd
 3/8” diameter hole is for the wire. Wire goes through the roof and the 
bracket. Insert 3/8” plastic grommet in the hole from inside van going outside.  
Run wire through the bracket and grommet. Silicone the hole. 
5.  Follow the attached wiring diagram for the standard 3-way switching included in 
kit. This gives the option of turning light on from the cab of the vehicle or the 
rear or side doors. 
Note: See attached wiring diagram. 
  Note: If desired, light can be activated with a single pole single throw switch in the dash.


